ChargePort Benefits.
Low Cost
Install on a standard grid connection (20kW) and support fast charging (up to 200kW) without the need for an expensive upgrade of your utility connection.
Fast Charging
ChargePort station allows super fast charging, adjusting automatically to each EV’s capabilities and kW acceptance criteria. It takes 30 min for standard charging.
Quick to Install
ChargePort works on a standard grid connection, so no extra work from the distribution system operator (DSO) is needed to set up the shop.
Pay what you spent
No reservation of funds is needed; type in the amount you want to spend and pay the exact amount–no more, no less.
Wide Availability
Setup at any location with standard grid connections, locations without a grid, or locations with mixed energy sources.
Cashless Payment
No need to have cash on hand. Securely pay via credit card or mobile phone through our PCI DSS-certified card reader.